Location: Wuhu City, China
Time: 2019
Treatment Capacity: 16,100 m3/d
WWTP Type: Decentralized Integrated FMBR Equipment WWTPs
Process: Raw Wastewater→ Pretreatment→ FMBR→ Effluen6
Project Brief:
The project utilizes FMBR technology with a decentralized 'Collect, Treat, and Reuse On-site' approach, with an overall capacity of 16,100 m³/day. Currently, three WWTPs are operational, and the treated water is used to replenish the river, helping to mitigate pollution.
